CHAI Junbing, LI Yonghai, SU Hang, XU Yongan , SHI Kuanglin.
Equipment for Geophysical Prospecting. 2025, 35(3): 153-157.
During the construction process of international oil exploration projects, some projects need to establish independent coordinate systems. In addition, the current high - efficiency exploration and acquisition projects need to adopt global high - precision real - time satellite station differential services to improve the acquisition efficiency, and the coordinate system of the control point needs to be consistent with the real - time satellite station differential results to minimize the impact of different coordinate systems. How to choose the precision single - point positioning online processing service for international projects has become a problem for international oil exploration projects. This paper describes in detail the data requirements and output results of four online processing services, namely, CSRS, AUSPOS, RTX and OPUS, which are often used in international projects. The data of international oil exploration projects at different times, different locations and different acquisition durations are sent to the four online services for processing, and the results show that the processing results of CSRS, AUSPOS, and RTX are more consistent, and the results are more consistent with those of AUSPOS, RTX, and AUSPOS. AUSPOS, RTX and CSRS have latitude and longitude rms (root - mean - square error) less than 0.0003 s and elevation rms error less than 0.030 m, OPUS processing results are more different from the other three, with latitude, longitude and elevation rms errors of 0.00038 s, 0.00051 s and 0.124 m, respectively. In the construction of the international project, it is necessary to take into account the reference frame, calendar elements, results reporting, timeliness and other factors, result reporting, timeliness and other factors, choose one of CSRS, AUSPOS and RTX, and OPUS results are not recommended.